PAST PROJECTS

PAST PROJECTS

Contact US

Past Projects

Summit Steel Buildings talented team has delivered many projects from concept to completion.
Our experience, knowledge and passion spans a wide variety of industries. Take a look at our portfolio.

Boucher Bros

This building was engineered to attach to an existing metal building for the company’s expansion as well as to the rigorous climate of British Columbia. In addition to supplying the building Summit Steel Buildings also oversaw the excavation, concrete foundation and slab installation as well as the building erection by our certified installer Double Black Construction.


Explore

Covanta Environmental

This waste processing facility was designed and engineered adjacent to an existing warehousing structure. Summit Steel Buildings provided the pre-engineered metal building and structural components as well as overseeing engineering, excavation, concrete foundation and slab installation. 


Explore

Alberni Power & Marine

In the beautiful surroundings of Vancouver Island, British Columbia, demand for watercraft, storage and repairs required Alberni Power & Marine to seek out Summit Steel Buildings to build their new metal storage and wash bay buildings.



Explore

FCMP Outdoor

To meet increasing manufacturing demand, FCMP Outdoor turned to Summit Steel Buildings to erect a 35,000-square-foot production and warehouse building. The design also incorporated internal office spaces, a client showroom and a second-floor mezzanine for enhanced workflow mapping.

Explore

FCMP Expansion

After building an initial 49,000-square-foot headquarters, Thorndale, Ontario gardening supply manufacturer chose Summit Steel Buildings once again for two subsequent expansions. Jobsite photos give you a behind-the-scenes look at the most recent addition.



Explore

San Group Boiler Building

This building was designed and engineered to cover overtop an existing sawmill while avoiding all existing equipment, buildings and ongoing operations. Building was also engineered to support a 5 ton crane system that was also used to dismantle the existing building underneath.

 


Get quote

San Group Building D

This building was unique in that it was a 75,000 square foot clear span building engineered to sit atop a soil class E/F consisting of “hog fuel” in a high wind high seismic zone on Vancouver Island. In addition Summit contracted and managed all excavation, concrete/foundation installation and complete building erection.

View the overhead drone video of the completed project.


Get quote

San Group Kiln Foundation

This building is being used to cover and protect 4 industrial kilns from German manufacturer Hildebrand-Brunner on Vancouver Island. In addition to the building engineering and supply, Summit managed all excavation, concrete/foundation work and building erection.


Get quote

Ready to get started?

Call us at 877-417-8335

Share by: